| Certificate No: | QAMA/TPI/2026/001 |
|---|---|
| Inspection Date: | 12 January 2026 |
| Issue Date: | 14 January 2026 |
| PO / WO Ref: | BSP/WO/TPI/2026-78 (05 Jan 2026) |
| Client / Owner: | Steel Authority of India Limited (SAIL - BSP) |
|---|---|
| Project Name: | Blast Furnace #7 Shell Welds Overhaul |
| Job Location: | SAIL Bhilai Steel Plant, Bhilai (C.G.) |
| Client GSTIN: | 22AAACS0222M1Z8 |
| Equipment / Component Under Examination | |
|---|---|
| Ultrasonic Testing & Magnetic Particle Inspection of 24 Butt Welded Shell Seams (Plate Thickness 28mm to 36mm, Material IS 2062 E350BR). |
| Technical Examination Parameters & Applied Standards | |||
|---|---|---|---|
| Inspection Technique: | Ultrasonic Testing (UT) & Magnetic Particle Testing (MPT) | Standard / Code Applied: | ASME Section V Art. 4 & ASME Section VIII Div. 1 App. 12 |
| Procedure Reference: | QAMA/SOP/UT-004 Rev. 2 | Calibration Due Date: | 15 Dec 2026 |
| Equipment & Probes: | Olympus Epoch 600 UFD, 2MHz & 4MHz Angle Beams (45, 60, 70 deg) Calibrated with IIW-V1 Block | ||
| Result / Conformance | Engineering Remarks & Conclusion |
|---|---|
|
Fit for Service
|
All examined 24 circumferential and longitudinal shell weld joints comply with ASME Section VIII Div 1 acceptance criteria. No relevant linear or planar flaw indications detected. Structure certified fit for design working pressure for a period of 12 Months. |